Palabora Mining, Boiler Optimization, South Africa

Boiler Optimization Project

Location:

Status:

Sector:

Phalaborwa, South Africa

Mining and Heavy Industry

Completed

Project

Challenges

  • The Three (3) 30 ton Boilers supported by a coal supply of 20,000 tons per annum. Two (2) of the boilers operate 24/7, to supply steam to the copper refinery and only are shutdown apart from short periods when the refinery in not operational. The annual coal cost to operate the boilers is US$3M p.a.

Goals & Objectives

  • The primary objective was to develop a process redesign of the control of the boiler coal feed conveyor to improve energy efficiency by 25% by monitoring excess oxygen on the exhaust stack.

Solutions

Service provided

  • Design of Energy Efficiency

  • Energy Management Software & IT Energy Modelling

  • Techno-Economic Modelling to establish the Business Case

  • Project Management

  • Measurement and Verification of Energy Saving

Results and Benefits 

Financial Results

  • 45% IRR

  • Capital Investment $1.25M

  • Annual Gross Savings $0.6M

  • 2.5% COGS

Technologies applied

  • Excess Oxygen Control

  • Equipment Optimisation

  • Meter Technology

  • Online Electricity Dashboard

ESG Impact

  • 850 ton CO2 savings

image.png

Contact us 
for assessment and quotations
of your project

Project Location

Phalaborwa, South Africa