Project
Challenges
The 6MW SO2 Blower operate 24/7 to draw exhaust air from the Copper Converter Blows which operate in a batch process. The annual coal cost to operate the SO2 blower is US3M p.a.
Goals & Objectives
The primary objective was to design and implement an energy efficient SO2 blower system with a target 75% energy saving reduction by matching operation of the 6MW blower motor only when then copper converter operates which requires the turning off of the motor during non-batch converter processes.
Solutions
Service provided
Design of an Energy Efficient SO2 Blower
Energy Management Software & IT Energy Modelling
Techno-Economic Modelling to establish the Business Case
Project Management
Measurement and Verification of Energy Saving
Results and Benefits
Financial Results
40% IRR
Capital Investment $5M
Annual Gross Savings $2.2M
2.5% COGS
Technologies applied
Induction Motor
VSD Operation
Equipment Optimization
Meter Technology
Online Electricity Dashboard
ESG Impact
35,000 tons CO2 savings

Project Location
Phalaborwa, South Africa